Jump to content
Electronics-Lab.com Community

Dekking

Members
  • Posts

    4
  • Joined

  • Last visited

Dekking's Achievements

  1. More information is needed. The ICM7555 can probably do this but a potentiometer will be needed to adjust the delay. A microcontroller can be used to build a more flexible timing device but will need a voltage regulator (5V or 3.3V) and an output buffer to interface with the 18V devices.
  2. Hello, everyone! Can anyone tell me about BGA rework Process and the material required for that? Also, please suggest me best training institute nearby Illinois where I can learn BGA rework practically.
×
  • Create New...