Search results

  1. D

    DC Timer

    More information is needed. The ICM7555 can probably do this but a potentiometer will be needed to adjust the delay. A microcontroller can be used to build a more flexible timing device but will need a voltage regulator (5V or 3.3V) and an output buffer to interface with the 18V devices.
  2. D

    BGA rework Process?

    Hello, everyone! Can anyone tell me about BGA rework Process and the material required for that? Also, please suggest me best training institute nearby Illinois where I can learn BGA rework practically.
Top