I use a cabinet with each E6 value going down the columns, and the multiplliers going across the rows. i.e. each columns will have 1, 1.5, 2.2, 3.3. 4.7, 6.8, and the rows are 1, 10, 100, 1K, 10K, 100K, 1M. I put the next higher E12 value in the same drawer with the E6 values. So for the E12...