Dekking
-
Posts
4 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Posts posted by Dekking
-
-
Hello, everyone! Can anyone tell me about BGA rework Process and the material required for that? Also, please suggest me best training institute nearby Illinois where I can learn BGA rework practically.
DC Timer
in Inventive/New Ideas
Posted
More information is needed.
The ICM7555 can probably do this but a potentiometer will be needed to adjust the delay.
A microcontroller can be used to build a more flexible timing device but will need a voltage regulator (5V or 3.3V) and an output buffer to interface with the 18V devices.